Storm Water Master Plan Cover Page

Executive Summary

Table of Contents

Section 1: Introduction

Section 2: USEPA Storm Water Compliance

Section 3: Geographic Information System Updates

Section 4: Detailed Study Area #1 "Terrible Trapezoid"

Section 5: Detailed Study Area #2 "Washington Street"

Section 6: Remaining Sub-Basin Investigations

Section 7: Outfall Inspections

Section 8: Evaluating Funding Mechanisms for a Storm Sewer Enterprise

Section 9: Project Prioritization, BMP's and Rehabilitation Measures

Section 10: Capital Improvements Plan (CIP)

Appendix A: Runoff and Extran Input files for Terrible Trapezoid

Appendix B: Washington Street Inspection Reports

Appendix C: "Manual" for Use in Report Creation from Electronic Databases

Appendix D: Photos of Select Manholes and Pipes from Washington Street Basin

Appendix E: Detail Sketches from Washington Street Manhole Inspection

Appendix F: Photos of Select Outfalls from Merrimack River Study

Appendix G: Field Sheet for Outfall Inspections